CDJ 2026 TSHC 1333
|
| Court : High Court for the State of Telangana |
| Case No : CIVIL REVISION PETITION No. 1307 of 2025 |
| Judges: THE HONOURABLE MR. JUSTICE GADI PRAVEEN KUMAR |
| Parties : S.V. Constructions, Represented by its Proprietor Sri Prabhakar Versus The Deputy Chief Engineer & Another |
| Appearing Advocates : For the Petitioner: Vidya Sagar Bhuchupati, Advocate. For the Respondents: R.S. Sravan Kumar, Advocate. |
| Date of Judgment : 20-11-2026 |
| Head Note :- |
Arbitration & Conciliation Act, 1996 - Section 34 -
|
| Summary :- |
1. Statutes / Acts / Rules / Orders / Regulations, and Sections Mentioned:
- Arbitration and Conciliation Act, 1996
- Section 34 of the Arbitration and Conciliation Act, 1996
- Section 2(1)(e) of the Arbitration and Conciliation Act, 1996
- Section 20 of the Arbitration and Conciliation Act, 1996
- Section 42 of the Arbitration and Conciliation Act, 1996
- Section 34(3) of the Arbitration and Conciliation Act, 1996
- Limitation Act (reference to Section 5)
- General Conditions of Contract, 2014 (GCC)
2. Catch Words:
- Arbitration
- Section 34
- Territorial jurisdiction
- Seat of arbitration
- Venue
- Limitation
- Condonation of delay
- Non‑judicial stamp paper
- Online/virtual proceedings
3. Summary:
The revision petition challenges a docket order that dismissed a Section 34 application on the ground of lack of territorial jurisdiction. The Court examined the distinction between “seat” and “venue” of arbitration, emphasizing that the seat must be determined from the arbitration agreement or parties’ conduct, not merely from the arbitrator’s location or the stamp paper used. The GCC clause on place of arbitration allows the railway division, its headquarters, or a mutually agreed place, none of which designate Prayagraj as the seat. Consequently, the Secunderabad courts retain jurisdiction. The court also noted that the lower court erred by not considering the condonation of delay application. The impugned order is set aside, and the case is remitted for proper consideration of the Section 34 petition and delay condonation.
4. Conclusion:
Petition Allowed |
| Judgment :- |
|
1. Heard Ms.Meghana learned counsel representing Sri Vidya Sagar Buchupati, learned counsel for the petitioner and Sri R.S.Sravan Kumar, learned counsel for the respondents.
2. The present Civil Revision Petition is filed assailing the docket order dated 09.01.2025 passed in Arb.O.P./ R.P.S.R.No.18938 of 2024 by the learned I - Additional Chief Judge, City Civil Court at Secunderabad (for short, ‘the Court below’), whereby the petition filed by the revision petitioner under Section 34 of the Arbitration and Conciliation Act, 1996 (for short, ‘the Act’) against the Arbitral Award dated 24.05.2024 was returned at the threshold on the sole ground of want of territorial jurisdiction.
3. The brief facts of the case are that the respondent No.1 had entered into an agreement dated 03.01.2018 with the petitioner for providing OHE Mast Bridge over bridge piers in between Pagadipalli- Nadikudi-Nallapadu including MCLA-VNUP-JANPHAD section in Guntur Division of South Central Railway, at a contract work rate of Rs.94,10,226/- against a tender value of Rs. 1,15,19,150.61/-. The Agreement is governed by the General Conditions of Contract, 2014 (for short, ‘the GCC’).
4. The tender schedule comprised sixteen bridges, but drawings were furnished for only twelve. The revision petitioner completed ten bridges and two more were nearing to complete. After issuing a 7 day notice dated 07.03.2019 and a 48 hour notice dated 15.04.2019, respondent No.1 terminated the contract on 23.04.2019. The revision petitioner challenged the termination before this Court vide W.P. No.9647 of 2019, wherein this Court, by order dated 30.04.2019 in I.A. No.1 of 2019, directed that no coercive steps be taken and that the Bank Guarantees and Security Deposit be kept intact. The said writ petition was later dismissed as withdrawn, vide order dated 19.08.2020.
5. As the payments were not released, the disputes were referred to arbitration. The General Manager/CORE, Prayagraj, vide Letter No.CORE/Civil/ARB/SVC/BMO dated 23.09.2022, appointed respondent No.2 as Sole Arbitrator to adjudicate claims of about Rs.39,53,584/-. Respondent No.2 entered upon the reference by Arbitral Notification No.CORE/S&T/Arb/SVC/RESC dated 15.11.2022. The proceedings were conducted in virtual and offline modes.
6. The learned Sole Arbitrator passed the Award dated 24.05.2024, partly in favour of the revision petitioner, but declined Claims Nos.3, 9, 10, 11 and 12 without sufficient reasons. Aggrieved thereby, the revision petitioner presented a petition under Section 34 of the Act before the Court below on 17.10.2024 vide SR.12981 of 2024 along with an application for condonation of delay, justifying the delay due to the petitioner's son undergoing a major surgery, which was later represented and assigned R.P.S.R. No.18938 of 2024 dated 20.11.2024.
7. The Court below, without numbering the petition, calling for the arbitral record or issuing notice, passed the impugned Docket Order dated 09.01.2025. The operative portion of the said order reads as under:
"In the instant case, the petitioner filed arbitration award. The arbitrator signed and mentioned in the award Dy.CSTE/P-I/CORE Prayagraj. The Award is stamped on non-judicial paper issued by the Uttar Pradesh. Therefore, the citation relied upon by the counsel for the petitioner is not applicable to the present facts of the case. Therefore, this court has no jurisdiction to entertain the petition under Sec.34 of the Arbitration and Conciliation Act, 1996. Accordingly, the petition is returned."
8. Aggrieved by the impugned Docket Order, the revision petitioner has preferred the present Civil Revision Petition.
9. Ms.Meghana learned counsel representing Sri Vidya Sagar Buchupati, learned counsel for the petitioner, contended that the Court below adopted an hyper-technical approach at the initial stage of scrutiny and registration of the AOP which would cause damage to the very concept of the Act and as such, the impugned order is contrary to law.
10. Learned counsel further contended that the learned Court below has erroneously returned the AOP by completely misunderstanding the prevailing statutory provisions, though it is clearly understood from the conduct of the Arbitral proceedings that the respondent No.2 had conducted the arbitration owing to his convenience as his office i.e., CORE department concerning the electrification matters of the Railway Board is situated at Prayagraj, Uttar Pradesh. Therefore, it can only be treated as a ‘venue’ for conducting arbitration proceedings and not as the ‘seat of arbitration’.
11. Learned counsel for the revision petitioner relied upon the judgment of the Hon’ble Supreme Court in the case of BBR (India) Pvt., Ltd., vs. S.P.Singla Constructions Pvt. Ltd. ((2022) SCC Online SC 642), wherein it was held that the Courts having jurisdiction over Panchakula in Haryana, have exclusive jurisdiction and the Courts in Delhi would not get jurisdiction as the jurisdictional “seat of arbitration’’ is Panchakula at North Delhi. Learned counsel contended that the learned Court below has drawn incorrect reference from the above citation, though the finding in the said decision is squarely applicable to the facts of the present case, the court below erroneously returned the petition on the ground that the citation relied on by the revision petitioner is not applicable and held that the Court has no jurisdiction to entertain the petition filed under Section 34 of the Act. Learned counsel also stated that since the office of the respondent No.1 is situated at Secunderabad and the proceedings are conducted through online, the Court below is having jurisdiction to entertain the subject application.
12. Learned counsel placed reliance upon Section 2(1)(e) of the Act, which defines the term ‘Court’, Section 20 of the Act, which relates to ‘place of arbitration’ as well as Section 42 of the Act relates to ‘jurisdiction’ and contended that neither the Agreement for Works dated 03.01.2018 nor the arbitral notification dated 15.11.2022 issued by the respondent No.2 fixes or entails that the ‘seat’ of arbitration is at ‘Prayagraj, Uttar Pradesh’. Learned counsel further contended that in the absence of any specific clause or an agreement in writing between the parties, it can only be treated as a ‘venue and not as the ‘seat’ of arbitration.
13. Learned counsel further contended that the Court below without considering the statutory provisions had returned the AOP by passing the impugned docket order which is bereft of any valid legal reasoning and such an improper exercise of the Court below is amenable to correction by this Court by invoking powers under Article 227 of the Constitution of India. Hence, learned counsel prays to allow the Civil Revision Petition and set aside the impugned docket order.
14. On the other hand, Mr. R.S.Sravan Kumar, learned counsel for respondent No.1, vehemently contended that though there is a no mention of seat of arbitration in the agreement dated 18.10.2017, the competent authority and the Arbitral Tribunal have implicitly acknowledged Prayagraj as the seat of the Tribunal through their choice of the CORE. It is further contended that mere permitting the proceedings to conduct online, does not itself mean that the petitioners can invoke the jurisdiction of the Court below, which cannot be permitted. Therefore, for all purposes, the jurisdiction lies to the Court at Prayaraj only.
15. Learned counsel further contends that even otherwise, the sole arbitrator passed award on 25.05.2024, the said award was received, according to the applicant on 01.06.2024 and in terms of Section 34 of the Act, the limitation is three months along with condonable delay of another 30 days.
16. In support of his contentions, learned counsel for the respondent relied upon the decision of the Hon’ble Supreme Court in My Preferred Transformation & Hospitality Pvt. Ltd. v/s. M/s. Faridabad Implements Pvt. Ltd. (2025 INC 56),wherein it was considered whether a Court can condone delay beyond 30 days, as specified in the proviso to Section 34(3) of the Act, by relying on Section 5 of the Limitation Act, and that the expression’ but not thereafter’ in the proviso to Section 34(3) would amount to an express exclusion within the meaning of Section 29(2) of the Limitation Act.
17. Learned counsel would further rely upon the judgments of the Hon’ble Supreme Court in BGS SGS Soma JV v/s. NHPC Limited ((2020) 4 SCC 234); and Arif Azim Company Limited v/s. Micromax Informatics FZE ((2025) 9 SCC 750), wherein it was held that ‘venue’ is considered the seat in the absence of any significant contrary indica. Learned counsel also relied upon another judgment in Simplex Infrastructure Limited v/s. Union of India ((2019) 2 SCC 455) to contend that Section 5 of the Limitation Act is not applicable to Section 34 (3) of the Arbitration Act and the delay beyond three months plus 30 days cannot be condoned. Accordingly, learned counsel prays to dismiss the Civil Revision Petition.
18. I have given my earnest consideration to the submissions made by the learned counsel for both the parties and perused the record.
19. Now, the principal question that arises for consideration is as to whether the Court below committed any error in returning the petition filed by the revision petitioner under Section 34 of the Act, on the ground of want of territorial jurisdiction.
20. Before examining the rival contentions, it is necessary to notice the relevant statutory provisions governing the territorial jurisdiction of Courts in arbitration matters.
21. Section 2(1)(e) of the Act defines the expression 'Court' as the Principal Civil Court of original jurisdiction in a district, including the High Court in exercise of its ordinary original civil jurisdiction, having jurisdiction to decide the questions forming the subject matter of the arbitration, if the same had been the subject matter of a suit.
22. Section 20 of the Act enables the parties to agree upon the place of arbitration and also empowers the Arbitral Tribunal, subject to the agreement of the parties, to determine the place of arbitration.
23. Section 42 of the Act provides for exclusive jurisdiction of the Court before which an application under Part I of the Act has been made, subject to the statutory requirements contained therein.
24. The distinction between the ‘juridical seat’ and the ‘venue of arbitration’ has been authoritatively explained by the Hon'ble Supreme Court in BGS SGS Soma JV ‘s case (3 supra). The juridical seat of arbitration determines the supervisory jurisdiction of the Courts over the arbitral proceedings. Ordinarily, where the parties designate a particular place as the ‘seat of arbitration’, the Courts exercising jurisdiction over such seat alone would have exclusive supervisory jurisdiction over the arbitral proceedings. However, the determination of the seat is required to be made by examining the arbitration agreement, the relevant contractual provisions and the conduct of the parties and not merely by referring to the physical location where the arbitrator happens to conduct the proceedings or pronounce the Award.
25. In BBR (India) Private Limited’s case (supra), the Hon'ble Supreme Court reiterated that once the juridical ‘seat of arbitration’ is determined, a subsequent change in the venue of conducting hearings does not, by itself, result in a change of the ‘juridical seat’. The Court further clarified that the juridical seat continues to remain the same unless the parties by their agreement or conduct recognized in law, alter the same. Similarly, in Arif Azim Company Limited’s case (4 supra), the Hon'ble Supreme Court emphasized that the determination of the juridical seat must be made by ascertaining the intention of the parties from the relevant contractual terms and surrounding circumstances.
26. Applying the aforesaid principles to the facts of the present case, it is evident that the Court below proceeded to determine territorial jurisdiction solely on the basis that the Sole Arbitrator was appointed by the General Manager/CORE, Prayagraj, and that the Award was signed by an officer bearing the designation Dy.CSTE/P-I/CORE, Prayagraj. The Court below also placed reliance upon the fact that the Award was engrossed on non-judicial stamp paper issued in the State of Uttar Pradesh.
27. The appointment of an Arbitrator by an authority stationed at a particular place is not equivalent to an agreement between the parties designating that place as the juridical seat of arbitration. Likewise, the official designation or place of posting of the Arbitrator cannot, by itself, determine the territorial jurisdiction of the Court. The place where the Award is signed or the State from which the non-judicial stamp paper is obtained is also not a determinative factor for identifying the juridical seat. These are merely incidental circumstances and cannot override the contractual provisions governing the arbitration.
28. It is also relevant to notice that the arbitration proceedings in the present case were conducted through both virtual and offline modes. The mere fact that certain hearings were conducted at Prayagraj or that the Arbitrator was functioning from the CORE establishment at Prayagraj does not automatically establish that Prayagraj was designated as the juridical seat of arbitration. At the same time, the conduct of virtual proceedings does not, by itself, confer jurisdiction upon the Courts at Secunderabad. The question must necessarily be determined with reference to the arbitration agreement and the relevant contractual provisions.
29. On perusal of the GCC, this Court finds that Clause 64(1)(iii)(d), which deals with the place of arbitration, assumes considerable significance. The said clause reads as follows: "Place of Arbitration: The place of arbitration would be within the geographical limits of the Division of the Railway where the cause of action arose or the Headquarters of the concerned Railway or any other place with the written consent of both the parties."
30. A plain reading of the aforesaid clause makes it clear that the parties contemplated three alternatives for determining the place of arbitration, namely, (i) the geographical limits of the Railway Division where the cause of action arose; (ii) the Headquarters of the concerned Railway; or (iii) any other place mutually agreed upon in writing by both parties.
31. In the present case, upon considering the Annexure-II Agreement for Works, the agreement is entered between the South Central Railways, Secunderabad with M/s. S.V. Constructions, 2-2-556, BaghAmberpet, Hyderabad-13. The work entrusted under the agreement related to providing OHE Bridge Mast Over Bridge Piers between Pagidpalli-Nadikudi-including MCLA-VNUP-JANPAHAD Section etc., in Guntur Division of South Central Railways. Thus, the contractual relationship was with South Central Railway, having its Headquarters at Secunderabad, whereas the work was required to be executed within the territorial limits of the Guntur Division.
32. In the light of Clause 64(1)(iii)(d), the geographical limits of the concerned Railway Division and the Headquarters of the concerned Railway are expressly recognized as permissible places of arbitration. The clause does not designate Prayagraj as the exclusive place of arbitration, nor is there any material placed before this Court to demonstrate that both parties had subsequently agreed in writing to designate Prayagraj as another place of arbitration, as contemplated under the said clause.
33. It is true that the Sole Arbitrator was appointed by the General Manager/CORE, Prayagraj, vide letter dated 23.09.2022 and entered upon the reference pursuant to the arbitral notification dated 15.11.2022. However, the authority which appointed the Arbitrator and the contractual place of arbitration are two distinct matters. The appointment of the Arbitrator by an authority situated at Prayagraj cannot, in the absence of a contractual stipulation or a subsequent agreement between the parties, be construed as an agreement designating Prayagraj as the juridical seat of arbitration.
34. Another relevant circumstance is that the counter-affidavit filed on behalf of the Railways does not establish any specific contractual stipulation designating Prayagraj as the exclusive juridical seat of arbitration. On the contrary, the record does not disclose any mutually agreed written arrangement under Clause 64(1)(iii)(d), by which Prayagraj was subsequently selected as the place of arbitration. Therefore, the mere appointment of the Arbitrator from the CORE establishment at Prayagraj cannot be elevated to the status of a contractual designation of the juridical seat.
35. At this juncture, it is appropriate to refer to the decision of the Hon'ble Supreme Court in BGS SGS Soma JV’s case (3 supra), particularly paragraph 59 thereof, which reads as under:
“Equally incorrect is the finding in Antrix Corporation Ltd. (supra) that Section 42 of the Arbitration Act, 1996 would be rendered ineffective and useless. Section 42 is meant to avoid conflicts in jurisdiction of Courts by placing the supervisory jurisdiction over all arbitral proceedings in connection with the arbitration in one Court exclusively. This is why the section begins with a non-obstante clause, and then goes on to state “…where with respect to an arbitration agreement any application under this Part has been made in a Court…” It is obvious that the application made under this part to a Court must be a Court which has jurisdiction to decide such application. The subsequent holdings of this Court, that where a seat is designated in an agreement, the Courts of the seat alone have jurisdiction, would require that all applications under Part I be made only in the Court where the seat is located, and that Court alone then has jurisdiction over the arbitral proceedings and all subsequent applications arising out of the arbitral agreement. So read, Section 42 is not rendered ineffective or useless. Also, where it is found on the facts of a particular case that either no “seat” is designated by agreement, or the so- called “seat” is only a convenient “venue”, then there may be several Courts where a part of the cause of action arises that may have jurisdiction. Again, an application under Section 9 of the Arbitration Act, 1996 may be preferred before a court in which part of the cause of action arises in a case where parties have not agreed on the “seat” of arbitration, and before such “seat” may have been determined, on the facts of a particular case, by the Arbitral Tribunal under Section 20(2) of the Arbitration Act, 1996. In both these situations, the earliest application having been made to a Court in which a part of the cause of action arises would then be the exclusive Court under Section 42, which would have control over the arbitral proceedings. For all these reasons, the law stated by the Bombay and Delhi High Courts in this regard is incorrect and is overruled.”
36. The aforesaid principle was also considered in Arif Azim Company Limited’s case (4 supra). Thus, in the absence of an established exclusive juridical seat, the territorial jurisdiction of the Court has to be determined with reference to Section 2(1)(e) of the Act, read with the ordinary principles governing territorial jurisdiction and the relevant contractual provisions.
37. In the present case, the contract was entered into by South Central Railway, the Headquarters of the concerned Railway is situated at Secunderabad, and the agreement itself recognizes the Headquarters of the concerned Railway as one of the permissible places of arbitration. Further, the work formed part of the Railway's project within the Guntur Division. Consequently, the contractual relationship and the performance of the work disclose material components of the cause of action within the territorial jurisdiction of the Courts concerned at Secunderabad, subject to the requirements of Section 2(1)(e) of the Act.
38. It is also necessary to clarify that the mere fact that the revision petitioner is carrying on business at Hyderabad or that the Railway Headquarters is situated at Secunderabad would not, in isolation, be sufficient to confer jurisdiction. What is material in the present case is the cumulative effect of the contractual terms, the identity of the contracting Railway, the location of its Headquarters, the place of performance of the contractual obligations and the absence of any established agreement designating Prayagraj as the exclusive juridical seat. On an overall consideration of these circumstances, this Court is of the considered view that the Courts at Secunderabad cannot be excluded from exercising territorial jurisdiction over the proceedings merely on account of the Arbitrator's appointment and functioning from Prayagraj.
39. The contention of the learned counsel for respondent No.1 that the proceedings were conducted online only by way of convenience and that Prayagraj should, therefore, be treated as the seat of arbitration is not acceptable, in the absence of any supporting contractual stipulation or written agreement between the parties. The mode of conducting arbitral proceedings, whether physical, virtual or hybrid, is essentially a procedural arrangement. Such an arrangement cannot, by itself, determine the juridical seat of arbitration.
40. The learned counsel for respondent No.1 has also raised an objection regarding limitation under Section 34(3) of the Act, contending that the Award was announced on 24.05.2024 and that the petition filed on 17.10.2024 was beyond the prescribed period.
41. There can be no dispute with the settled proposition that Section 34(3) of the Act prescribes a limitation period of three months from the date of receipt of the arbitral award, with a further period of thirty days which may be condoned upon sufficient cause being shown, but not thereafter.
42. However, the question of limitation is distinct from the question of territorial jurisdiction which formed the basis of the impugned docket order. The Court below did not examine the application for condonation of delay on its merits, nor did it record any finding regarding the actual date of receipt of the Award, the applicability of the statutory period or the sufficiency of the reasons assigned by the revision petitioner for the delay.
43. In these circumstances, this Court is not inclined to adjudicate upon the question of limitation for the first time in the present Civil Revision Petition, particularly when the Court below has returned the petition at the threshold without numbering it and without considering the application for condonation of delay. It is left open to the Court below to consider the application for condonation of delay strictly in accordance with Section 34(3) of the Act and without being influenced by any observations made in this order. 44. In view of the foregoing discussion, this Court is of the considered opinion that the Court below committed an error in returning the petition filed under Section 34 of the Act on the ground that it lacked territorial jurisdiction. The material on record does not establish that 19
45. Prayagraj was mutually agreed upon or otherwise designated as the exclusive juridical seat of arbitration. The mere fact that the Arbitrator was appointed from CORE, Prayagraj, that the proceedings were conducted partly at Prayagraj, or that the Award was engrossed on non-judicial stamp paper issued in Uttar Pradesh, cannot independently confer exclusive jurisdiction upon the Courts at Prayagraj or divest the competent Courts at Secunderabad of their jurisdiction, since the agreement executed in the Secunderabad and the execution of the work was undertaken in Guntur within the zone of Secunderabad and therefore, the Court below has jurisdiction to entertain the application.
46. Accordingly, the impugned docket order dated 09.01.2025 passed in Arb.O.P./R.P.S.R.No.18938 of 2024 by the learned I Additional Chief Judge, City Civil Court, Secunderabad, is liable to be set aside. The Court below is directed to number the petition filed under Section 34 of the Act, and thereafter consider the application for condonation of delay and the petition under Section 34 of the Act, independently and in accordance with law. It is made clear that this Court has not expressed any opinion on the merits of the grounds raised by the revision petitioner against the Arbitral Award or on the merits of the application seeking condonation of delay.
47. In the result, the Civil Revision Petition is allowed. The impugned docket order dated 09.01.2025 is set aside. The matter is remitted to the Court below for consideration of the petition under Section 34 of the Arbitration and Conciliation Act, 1996, in accordance with law, including consideration of the application seeking condonation of delay. There shall be no order as to costs.
Pending miscellaneous petitions, if any, shall stand closed.
|
| |