logo

This Product is Licensed to ,

Change Font Style & Size  Show / Hide


  •            

 
print Preview print
Act Description :

THE RAJASTHAN LANDS SPECIAL IRRIGATION CHARGES ACT, 1953

Act Details :-

THE RAJASTHAN LANDS SPECIAL IRRIGATION CHARGES ACT, 1953



Act No. 25 of 1953



[Published in the Rajasthan Gazette (Rajpatra), Part 4-A, dated January 2, 1954]



[Received the assent of His Highness the Rajpramukh on the 18th day of December, 1953]



An Act to Provide for the levy of special charges in respect of lands included in irrigation Schemes.



Whereas it is expedient to provide for the levy of special charges by way of betterment charge and acreage rate on lands included in, and benefited or likely to be benefited by, irrigation scheme projected or controlled by and under taken or maintained at the cost of [State Government].



Be it enacted by the Rajasthan State Legislature as follows:-



1. Short Title, extent and commencement. - (1) This Act may be called the Rajasthan Lands Special



(2) [It extends to the whole of the State of Rajasthan.]



(3) It shall come into force on the date of its publication in the [Official Gazette] as an Act.



2. Interpretation. - (1) In this Act, unless there is something repugnant in the subject or context,-



(i) "acreage rates" means the charges levied under section 4 on lands included in an irrigation scheme;



(ii) "betterment charges" means the charges levied under section 5 on lands included in an irrigation scheme;



(iii) "canal" includes-



(a) all canals, channels, reservoirs, wells, tube-wells and lift irrigation arrangements constructed, maintained or controlled by the [State Government] for the supply or storage of water;



(b) all works, embankments, structures, supply and escape channels connected with such canals, channels, reservoirs, wells, tube-wells or lift irrigation arrangements;



(c) all water courses, that is to say, all channels which are supplied with water from a canal but which are not maintained at the cost of the [State Government] and all subsidiary works belonging to any such channels; and



(d) all parts of a river, stream, lake or other natural collection of still water or a natural drainage channel, the water of which is liable, by virtue of a declaration made under any law for the time being in force, to be applied or used by the [State Government] for the purpose of any existing or projected canal or drainage work;



(iv) "canal officer" means an officer appointed to exercise control or jurisdiction over a canal or any part thereof;



(v) 'capacity factor' means the ratio of the mean supply to the authorised full supply discharge of a canal; and "mean supply" for a period connoted the sum of the daily supply in cusec's divided by the number of days during that period;



(vi) "cusec" is the unit of discharge and means the rate of flow of one cubic foot of water per second;



(vii) "Divisional Canal Officer" means an officer appointed to exercise control over a division of a canal;



(viii) "drainage work" includes escape channels from a canal, dams, weirs, embankments, sluices, groins and other works for the protection of lands from flood or from erosion, formed or maintained by [State Government] but does not include works for the removal of sewage from towns;



(ix) [ X X X ]



(x) "irrigation scheme" means a scheme which has come or comes into operation after the 7th day of April, 1949, for any one or more of the following purposes, namely:-



(a) the irrigation of lands from any existing or projected canal,



(b) the extension of irrigation to lands situate within the approved irrigation boundary of an existing canal,



(c) the improvement of irrigation supply or capacity factors or water allowances to lands already irrigated,



(d) the provision for, or the improvement or drainage of, any reservoir, dam or embankment constructed, maintained or controlled by the [State Government] for the supply or storage of water;



(xi) "land" means land which is let or held for agricultural purposes or for purposes subservient thereto or for pasturage, and includes the land of a tank or other land covered with water which may be used for the purpose of irrigation or growing singhara or other produce also also land occupied by houses, enclosures or other structures on a holding but does not include abadi land;



(xii) "landholder" means the person to whom rent is, or but for a contract, express or implied, would be, payable and includes-



(a) in relation to a sub-tenant, the tenant-in-chief, and



(b) the holder of the whole or a portion of, or the participator in the profits of an estate, that is to say, land comprised in a jagir, Maufi Biswedari, Istamrardari, Zamindari or any other form of grant or assignment;



(xiii) "prescribed" means prescribed by this Act or by rules made thereunder



(xiv) "tenant" means the person who holds land from the [State Government] or from a landholder and by whom rent is, or, but for a contract, express or implied. Would be, payable and, except where the contrary intention appears, includes, in relation to a tenant, his sub-tenant, and an occupancy tenant means a tenant who has, under any law for the time being in force, the right of occupancy in respect of the land which he holds;



(xv) "water allowance" means the designed number of cusecs of outlet or distributary capacity per thousand acres of land included in an irrigation scheme; and



[(xvi) "water course" has the meaning assigned to it in the Rajasthan Irrigation and Drainage Act, 1954 (Rajasthan Act 21 of 1954)];



(2) [ X X X ]



3. Special irrigation charges that may be levied. - The special irrigation charges that may be levied under this Act, in addition to the rates or charges if any, recovered or recoverable under any other law or enactment for the time being in force, are all or any of the following, namely:-



(i) an acreage rate, and



(ii) a betterment charge.



4. Levy of acreage rates. - (1) Where in respect of any lands included in an irrigation scheme, expenditure has been or is likely to be, incurred by the [State Government] in the execution of any one or more of the following works or in undertaking any one or more of the following measures, namely:-



(a) rectangulation, sub-rectangulation or killabandi (that is to say, sub-division of land into one acre fields);



(b) level, topographical or soil surveys;



(c) construction of water courses;



(d) construction of village roads and works appertaining thereto:



the [State Government] may, for the purpose of recouping or meeting such expenditure, cause a schedule of acreage rates to be prepared showing the rates at which they shall be leviable on the lands, and the manner in which and the persons by whom they shall be payable.



(2) A draft of the schedule prepared under sub-section (1), shall be published in the [Official Gazette] and in such other manner, as may be prescribed.



(3) Any landholder or occupancy tenant who may be affected by the propose d acreage rates may, within sixty days from the date of the publication of the schedule in the [Official Gazette] present a petition In writing to the [State Government] stating his objections, if any, to the levy of the acreage rates or the incidence thereof.



(4) After considering the objections and after making such further inquiry into the matter as the [State Government] may think fit, the [State Government] shall determine the final schedule of acreage rates and cause the same to be published in the [official Gazette] and in such other manner, as may be prescribed.



5. Levy of betterment charges. - (1) The [State Government] may levy betterment charges in respect of the lands, which are included or are likely to be included in an irrigation scheme, by notifying in the [Official Gazette] and in such other manner as may be prescribed, its intention so to do, and shall specify in such notification such particulars respecting the proposed levy as it may think necessary, including particulars respecting the type and extend of irrigation proposed.



(2) At any time after the expiry of one month from the date of the notification referred to in sub-section (1), the [State Government] may cause a schedule of betterment charges to be prepared for all lands or class of lands included in an irrigation scheme showing the rates at which the charges shall be leviable on the lands and payable by the landholders and occupancy tenants thereof and the proportions in which the charges shall be so payable.



(3) In preparing a schedule under sub-section (2) for the levy of betterment charges in respect of any irrigation scheme, regard shall be had to the following; namely:-



(a) the type of irrigation.



(b) the improvement in irrigation,



(c) the extent of betterment accruing to the lands.



(4) A draft of the schedule prepared under sub-section (2) shall be published in the [Official Gazette] and in such other manner, as may be prescribed.



(5) Any landholder or occupancy tenant who may be affected by the proposed betterment charges may, within sixty days from the date of the publication of the schedule in the [Official Gazette] present a petition in writing to the [State Government] stating his objections, if any, to the levy of the betterment charges or the rate thereof.



(6) After considering the objections and after making such further inquiry into the matter as the [State Government] may think lit, the [State Government] shall determine the final schedule of betterment charges and cause the same to be published in the [Official Gazette] and in such other manner, as may be prescribed.



(7) The amount of the betterment charges leviable in respect if any lands included in an irrigation scheme shall not exceed one-half of the difference between the value of the lands with reference to such date prior to the commencement of any work in connection will the irrigation scheme as the [State Government] may, by notification in the [Official Gazette], fix in this behalf and their estimated value with reference to such other date after such commencement as the [State Government] may similarly fix, and such valuations shall be made in the prescribed manner.



(8) Where in an irrigation scheme only lift irrigation arrangements are maintained and operated by the landholders or occupancy tenants, the betterment charges leviable shall not exceed one-half of the charges which would otherwise have been payable for gravity flow irrigation.



(9) Whenever such lift irrigation arrangements are converted into gravity flew irrigation, the landholders or occupancy tenants, is the case may be, shall be liable to pay the full betterment charges in respect of the lands.



6. Finality of Schedule. - The special irrigation charges leviable under the schedules as published under sub-section (4) of section 4 and sub-section (6) of section 5 shall be final and no court shall call in question the schedules so published or the levy or rates of such charges or the determination by the [State Government] of the increase in value of lands for the purpose of levying betterment charges.



7. Demand of acreage rates and betterment charges. - (1) When the Schedule of acreage rates or betterment charges has been published in the [Official Gazette] under sub-section (4) of section 4 or sub-section (6) of section 5, the Canal Officer shall prepare a demand statement in respect there of in such form as may be prescribed containing full particulars of the amount which each landholder or occupancy tenant shall be liable to pay and cause a notice of demand to be send on him.



(2) Any land holder or occupancy tenant may, within such period, as may b prescribed from the date of the notice of demand, present a petition to the Divisional Canal Officer objecting to the demand or any part then of, and the petition shall be disposed of in such manner and orders passed thereon shall be subject to such appeals, as may be prescribed.



(3) Any amount due under a notice of demand shall, subject to any orders the it may be passed on appeal under sub-section (2), be payable within such time as may be prescribed.



8. Made of recovery. - (1) The special irrigation charges may be paid in cue or more instalments, as may be prescribed:



Provided that where the special irrigation charges are allowed to be paid instalments, interest shall be payable in respect of such instalments at such rate as may be prescribed and such interest shall be recovered in the same manner as the special irrigation charges.



(2) Notwithstanding anything contained in this section, the [State Government] may, subject to such conditions as may be prescribed, allow land-holder to relinquish any part of his land in favour of the [State Government] in satisfaction of the betterment charges payable in respect thereof.



9. Postponement of recovery in certain cases. - Where there has been a failure of crops in any area, the [State Government] may, notwithstanding anything to the contrary contained in this Act or the rules made thereunder, postpone for such period, as it things fit, the recover of any special irrigation charges, whether wholly or in part.



10. Apportionment of charges. - The special irrigation charges shall b recoverable from the landholders and occupancy tenants concerned in such proportions as may be prescribed:



Provided that in making any such apportionment between the landholder and the occupancy tenant of the same land, due regard shall be had to the prevailing practice in respect of the division of produce on capital values between such persons in respect of that land:



Provided further that where there are more landholders than one, they shall be jointly and severally liable for the portion recoverable from the land-holders and similarly where there are more occupancy tenants than one, they shall be jointly and severally liable for the portion recoverable from the occupancy tenant.



11. Special charges under Act to be a charge on land. - Any sum lawfully due under this Act by way of special irrigation charges shall take priority over all other charges payable in respect of the land except land revenue and shall be deemed to that extent to be a charge on the land and shall be recoverable as an arrears of land revenue.



12. Bar to jurisdiction of Civil Courts. - No civil court shall have jurisdiction in respect of any matter relating to anything done or to be done under this Act.



13. Non-liability of Government for losses etc. - No claim shall lie against the [State Government] for compensation or for the refund of special irrigation charges on account of loss occasioned by the failure or stoppage of water in a canal or by any cause beyond the control of the [State Government] or by any repairs, alterations or additions made to the canal by Canal Officer or the Divisional Canal Officer or by any measures taken by him for regulating the proper flow of water therein or for maintaining the established course of irrigation in cases where the Canal Officer or the Divisional Canal Officer considers such action to be necessary.



14. Indemnity. - No suit, prosecution or other legal proceedings shall be against any person in respect of anything done or intended to be done in good faith under this Act or the rules made thereunder.



15. Power to make rules. - (1) The [State Government] may, by notification in the [Official Gazette] make rules to earn out the purposes of this Act.



(2) In particular, and without prejudice to the generality of the foregoing power, such rules may provide for all or any of the following matters, namely:-



(a) the manner in which notices under this Act or the schedules of special irrigation charges shall be published.



(b) the manner in which valuation may be made of any lands for the purpose of sub-section (7) of section 5 and for determining their increase in value.



(c) the manner in which rates of special irrigation charges shall be calculated with reference to any lands or class of lands in an irrigation scheme,



(d) the time when, and the manner and form in which, demand statements in respect of special irrigation charges levied under this Act shall, prepared,



(e) the from in which notices of demand in respect of special irrigation charges levied under this Act may be prepared under this Act and the manner of their service,



(f) the time within which objection may be preferred form notices of demand, the procedure for the determination of such objection and the authorities to whom and the manner in which and the conditions subject to which appeals may be preferred therefrom,



(g) the time within which special irrigation charges shall be payable after the notice of demand and the manner in which such charges may be realised,



(h) the conditions subject to which any sum due under this Act may be paid in instalments and the rate of interest for the payment of such sum in instalments,



(i) the conditions subject to which any landholder may be allowed to relinquish any part of his land to the [State Government] in satisfaction of betterment charges due from him,



(j) the manner in which special irrigation charges may be apportioned between landholders and occupancy tenants,



(k) the manner in which and the conditions subject to which, any officer shall exercise his powers under this Act, and



(l) any other matter requiring to be prescribed under this Act.



Notifications



[Notification No. F.3 (12) PW/53 dated 10-12-54 published in Rajasthan Gazette, Part I(b) dated 18-12-54.]



In exercise of the powers conferred under section 5 of The Rajasthan Lands Special Irrigation Charges Act, 1953, published in part IV under notification No. F. 12(13)L/53, dated the December 24, 1953 in the Rajasthan Gazette of January 2, 1954 and rules framed thereunder published under Public Works Department Notification No. F. 2(108) IRG/52. dated September 7, 1954 in the Rajasthan Gazette September 25, 1954, the Government has been pleased to order that the Betterment Charges shall be levied on all Irrigation Works having a culturable commanded area of over 1000 acres. The realisation of these charges will commence from the date one year after the war is released for irrigation purposes.



[Notification No. F 9 (2) Irg./56 dated 19-12-1957, publish in Rajasthan Gazette, Part I(b), dated 2-1-1958]



As required under Sub-section (7) of section 5 of the The Rajasthan Lands Special Irrigation Charges Act, 1953 (Act No. XXV of 1953 it is hereby notified for general information that 15th June, 1946 will be treated as the date prior to the commencement of work on Bhakra Project and 15th J June, 1956 as the date after the commence lent of the Project for the purposes of the aforesaid section.



[Notification No. F 9 (2) Irg./57 dated 11-12-58, published in Rajasthan Gazette, Part IV-C, Extraordinary dated 13-12-58]



In pursuance of Sub-section (6) of section 5 of the The Rajasthan Lands Special Irrigation Charges Act, 1953 (Rajasthan Act XXV of 1953), read with Rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954, the Government of Rajasthan does hereby determine, sanction and publish the following Final Schedule of better lent Charges in respect of the lands in the following villages, irrigated by the Sadul and Karnisingh Branches of the Bhakra Canal, included in the Utrada and Dhikanada circles of Tehsil Ganganagar, and Circle I of Tehsil Hanumangarh, namely:-



The Final Schedule



S.No.        Name of District       Name of Tehsil         Name of assessment circle  No. of villages      Class of Soil   Charges if paid in lump sum Charges, if paid in instalment



                                                               Charges        Maximum number of instalments      Minimum amount on an instalment



1.   Ganganagar   Ganganagar   Utradha Circle 20      Barani Rs. 208/- per acre    Rs. 264/- per acre          24      Rs. 11/- per acre



2.   Ganganagar   Ganganagar   Dikha-madha Circle   4        Barani



Rs. 208/- per acre



Rs. 264/- per acre 24     



Rs. 11/- per acre



3.   Ganganagar   Hanumangarh Assessment Circle I   47      Barani                    24     



[1. The charges hereinabove provided shall commence with immediate effect.]



2. During the non-perennial stage of the Canal, the above instalments shall be payable only annually. When the canal becomes perennial, instalments shall be payable half yearly i.e. one instalment in each crop.



3. The names of villages on which the aforesaid betterment charges shall be recovered according to the above Scheduled are -



(1) 20 villages of Utradha and 4 villages of Dhikanadha circles of Tehsil Ganganagar viz., Banwali, Budharwali, Chak Bhagsar, Bhagsar, Chak Dularsar, Chak Fatehsingwala, Chak Kikarwali, Daliawali, Dulrasar, Dudakichar, Fateh-singhwala, Hakimabad, Lalgarh, Shamsinghwala, Jamiat-Singhwala, Chakkerra, Mamarkhera, Panniwali, Rotanwali, Sardarpura, Dungarsinghpura, Ganeshgarh, Jogiwala, Takhranwali.



(2) 47 villages of Assessment Circle No. 1 of Tehsil Hanuman-garh viz., Ainarpura-Jalu, Amargarh, Indarpura, Indargarh, Kheruwala, Buglanwali, Bolanwali, Bhagatpura, Paratap-nagar, Phuldesar, Jandwala-Sikhan, Deengarh, Rampura-Mahla, Gadharknera, Kararwala, Morjand-Khari, Sangaria, Singhpura, Santpura, Sunderpura, Shahpini, Bhakranwali, Alipura, Kishanpura-Utradha, Morjand Sikaman, Naraingarh, Nukera, Nurpura, Haripura, Hathianwala, Harisinghwala, Patili, Pratappura, Takhathazara, Matili-Saran, Chak Dhola, Sohanwala, Khatsajwar, Chamarkhera, Maniwali, Lambidhat, Dhakban, Dholnagar, Rasuvala, Dhingtanian, Nathwala, Matili-Khichran.



[Notification No. F 9(2) Irg./57 dated 21-3-1960, published in Rajasthan Gazette, Part IV C, Ordinary, dated 5-5-1960.]



In pursuance of Sub-section (6) of section 5 of the Rajasthan Lands Special Irrigation Charges Act, 1953 (Rajasthan Act XXV of 1953), read with rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954, the Government of Rajasthan does hereby determine, sanction and publish the following Final Schedule of betterment Charges in respect of the Lands in the following villages, irrigated by the Sadul branch and khara sub- branch of the Bhakra Canal, included in the assessment circle No. 2 of the Tehsil Hanumangarh, namely:-



The Final Schedule



S.No.        Name of District       Name of Tehsil         Name of assessment circle  No. of villages      Class of Soil   Charges if paid in lump sum Charges, if paid in instalment



                                                               Charges        Maximum number of instalments      Minimum amount on an instalment



1.   Ganganagar   Hanumangarh Circle No. 2    36      Barani Rs. 208/- per acre    Rs. 264/- per acre          24      Rs. 11/- per acre



1. The above instalments will be recovered annually till the canal runs non-perennial and half-yearly after it becomes perennial.



2. The recovery of instalments shall commence from the Rabi Crop of the year 1958-59.



3. The names of villages in which the aforesaid betterment Charges shall be recovered according to the above schedule are :-



Villages of Tehsil Hanumangarh assessment Circle No. 2. Viz., Ratanpura, Padampura, Nagrana, Dholipal, Bharampura, Bodla, Lalpura, Kilawali, Manuka, Kikarawall, Rorawali, Jonkiyan, Lilawali, Nawa, Chandra, Manaksar, Shergarh, Fatehpur Rohi, Chhapawali, Banwali, Pacca Sarnan, Makasar Barani, Khunja, Barani, Pacca Bhadwan, Jandwali, Kutab Barani, Midha Rohi, Dubli, Bas Kerim, Dabli Bas Sardar, dabli Bas Pema Rohi, Dabli Bas-Chaina, Dabli Bas Chugta, Dabli Bas Fateh Mohd., Pati Rahman, Hiranwali, Chistiyan, Dabli Bas Fateh Mohd., Pati Sohana and Uttam Singh wala.



[Notification No. F 14 (22) Irg./60 dated 10-10-1960, published In Rajasthan Gazette, Part IV-C, ordinary, dated 2-3- 1961.]



In exercise of the powers conferred under section 5 of the Rajasthan Lands Special Irrigation Charges Act, and clause 5 of the rules framed thereunder, the Government have been pleased to constitute a Board of the following officers to assess the Betterment fee leviable on the Lands coming under the Command of Bharatpur Feeder.



Collector, Bharatpur ............................ Convenor.



Executive Engineer Irrigation,



Matsya Division, Alwar ........................ Member.



[Notification No. F 14 (28) Irg./60 dated 17-1-1961, published in Rajasthan Gazette, Part IV-C, Ordinary, dated 2-3-1961.]



In pursuance of Sub-section (6) of section 5 of the Rajasthan Lands Special irrigation Charges act, 1953 (Rajasthan Act XXV of 1953), read with Rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954 the Government of Rajasthan does hereby determine, sanction and publish the following final schedule of Betterment Charges in respect of the lands in the following villages Commanded by the non perennial Irrigation projects, namely Meja and Sareri of District Bhilwara.



1. Meja Non-perennial irrigation Scheme.



I. Tehsil Bhilwara. - (1) Melola, (2) Pansal, (3) Belia Khurd, (4) Sabalpura, (5) Agarpura, (6) Bholi, (7) Pondras, (8) Mad-hopur, (9) Atun, (10) Jeepia, (11) Dhumras, (12) Harni Kalan, (13) Suwana, (14) Malan, (15) Bhilwara, (16) Dan-thal, (17) Mokhampura, (18) Halar, (19) Mohammadpura, (20) Dhool-Khera, (21) Jodhras, (22) Arjia, (23) Rupaheli, (24) Gathila-Khera, (25) Kishanwaton- Ki-Kheri, (26) Kun-vada, (27) Bhadali Khera, (28) Odan-Ka-Khera, (29) Harnai Khurd, (30) Kiratpura, (31) Sanganer, (32) Sidrias, (33) Rinchhra, (34) Palri, (35) Taswaria, (36) Chhapri.



II. Tehsil Mandal:- (1) Meja, (2) Suras, (3) Mandal, (4) Sontok-pura, (5) Rajpura, (6) Gudha.



III. Tehsil Banera. - (1) Mahwa Khurd, (2) Chamanpura, (3) Ked-pura, (4) Chhatri Khera. (5) Lampia, (6) Kherlia, (7) Ganeshpura, (8) Raisinghpura, (9) Daulatpura, (10) Ranningpura, (11) Kalsana, (12) Laxmipura.



2. Sarari Non-perennial Irrigation Scheme.



I. Tehsil Benera:- (1) Kasoria, (2) Dabla, (3) Gharta, (4) Baldarkha, (5) Bhateda, (6) Kundia Khurd, (7) Kundia Kalan, (8) Jasoria, (9) Vijaypura.



II. Tehsil Shahpura:- (1) Khamore.



III. Tehsil Hurda:- (1) Agoocha, (2) Barantia, (3) Balapura, (4) Lachhmangarh, (5) Gajsinghpura, (6) Jaisinghpura, (7) Bhojraj, (8) Chainpura, (9) Aplias, (10) Kanwalias, (11) Barkhera, (12) Zalimpura, (13) Sonodia, (14) Sareri, (15) Amartia, (16) Gadwalon-ka-Khera, (17) Balwantpura (18) Garolia Khera, (19) Lachmipura.



The Final Schedule of Betterment Charges



S.No.        Name of District       Name of Tehsil         No. of Villages          Class of Land      Betterment Charges



                                            Paid in lump sum per acre    Paid in instalments per-acre No. of instalments Amount of each instalment per-acre



1    2        3        4        5        6        7        8        9



1.   Bhilwara        Bhilwara        36      Barani                             



               Mandal 6        Parat & Banjar etc.   50/-    62/-    10      6.20



               Banera 21      Chahi  17/-    18/-    3        6



               Shahpura       1                                             



               Hurda  19                                            



[Notification No. F. 14 (25) Irg./60 dated 7-11-60, published in Rajasthan Gazette, Part IV-C, ordinary, dated 2-2-61]



In pursuance of Sub-section (6) of section 5 of the Rajasthan Lands Special Irrigation Charges Act. 1953 (Rajasthan Act XXV of 1953) read with Rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954 the Government of Rajasthan does hereby determine, sanction and publish the following final schedule of betterment charges in respect of the lands in the following villages commanded by the Non-perennial Irrigation Project, namely Bagolia and Kejar of District Udaipur.



I. Bagolia Non-perennial Irrigation Scheme Tehsil Mavli District Udaipur.



Names of villages:- 1. Khempur 2. Gandolikhera 3. Gordhanpura 4. Chhipikera 5. Dagli Khera Urf Fatehpura 6. Basni Kalan 7. Basni Khurd 8. Beer Ghas 9. Bhabli 10. Mavli 11. Rahimi 12. Ladana 13. Ladani 14. Lopd; 15. Bishanpura 16. Saruppura 17. Salera 18. Nai-ka-Dhana 19. Borka-Kua 20. Marteri.



II. Kejar Non-perennial Irrigation Scheme Tehsil Sarada District Udaipur.



Names of Villages:- 1. Kachhota 2. Kejar 3. Thakarda 4. Neemach 5. Sagtara.



The Final Schedule



 



Name of District  



Name of Tehsil    



No. of villages     



Class of Soil         Betterment Charges



                                   If paid in lump sum   If paid in instalments



                                            Charges        Number of instalments        Amount on each instalment



1    2        4        5        6        7        8        9



Udaipur     Mavil   20      Barani & uncultivated lands   Rs.



46   Rs.



56  



10   Rs.



5.60



                         Chahi lands    16      18      3        6.00



-do- Sarada 5        Barani & uncultivated lands   46      56      10      5.60



                         Chahi lands    16      18      3        6.00



The above instalments will be recovered annually and will take effect from Samvat 2017.



[Notification No. F. 14(12) Irg./60 dated 23-11-1960, published in Rajasthan Gazette, Part IV-C, Ordinary, dated 2-2- 1961.]



I pursuance of Sub-section (6) of section 5 of the Rajasthan Lands Special Irrigation Charges Act, 1953 (25 of 1953), read with Rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954, the State Government does hereby determine, sanction and publish the following final schedule of betterment charges in respect of the lands in the following villages commanded by the Non-perennial irrigation Projects, namely Gudha, Pech-Ki-Boari, Pai-Balapura, Bundi-ka-Gothara and Bhirnlat of District Bundi.



1. Gudha Non-perennial Irrigation Scheme.



Tehsil Bundi:- 1. Barodia 2. Danta 3. Sathoor 4. Borda 5. Bor-Khai li 6. Siona 7. Akoda 8. Thikarda.



Tehsil Hindoli:- 1. Daola 2. Chatarganj 3. Chata 4. Holaspura 5. Bhav anipura 5. Dahroli 7. Mangli Khurd 8. Mangli Kalan 9. Bor-Khei 10. Barwas 11. Raghunathpura 12. Khataoda 13. Mond-Ghasa 14. Anand Ganj 15. Aklore 16. Dhobra 17. Turkri 18. Dhebhaiyon-ko-Naya Gaon 19. Bichri 20. Dagaria 21. Bor Khera (Dhanao) 22. Dhanao 23. Chora 24. Jar-ka-Naya Gaon 25. Khati Khera 26. Dablana 27. Gorussiyou-ka-Khera 28. Raghunathpura (Jhoparia) 29. Bara Naya gaon 30. Ram Chandariji-ka-Khera 31. Gudha Sasiyon 32. Alod 33. Tehla.



2. Pech-Ki-Baori-Perennial Irrigation Scheme.



Tehsil Hindoll:- 1. Pech-ki-Baori 2. Kalamal 3. Rosanda 4. Kaveri 5. Umer 6. Saroopgarh 7. Piprala.



3. Ral-Balapura Non-perennial Irrigation Scheme.



Tehsil Nainwa:- 1. Dakoon 2. Maina 3. Kalamal 4. Dodi 5. Viyanta 6. Jeewanpura 7. Deopura (Gudha Sada) 8. Vartiyon 9. Bhajnari



4. Bundl-ka-Gothra Non-perennial Irrigation Scheme.



Tehsil Hindoli:- 1. Bundi-ka-Gothra 2. Rani 3. Sarsod 4. Luharia 5. Soori 6. Bargaon 7. Ninod 8. Bal 9. Ranipura 10. Sanwatgarh.



5. Bhimlat Non-perennial Irrigation Scheme



Tehsil Bundi:- 1. Ulera 2. Umerthoona 3. Sinta (Gudha Natha) 4. Watan 5. Sinti 6. Nim-ka-khera 7. Mangal 8. Gopalpura 9. Khunetia.



The Final Schedule of Betterment Charges



 



Name of District  



Name of Tehsil    



No. of villages     



Class of land        Betterment Charges



                                   If paid in lump sum   If paid in instalments



                                            Charges        Number of instalments        Amount on each instalment per acre



1    2        4        5        6        7        8        9



 



Bundi       



Bundi       



17(i)        



Barani & Parat.     Rs.



50/- Rs.



62/-



10   Rs.



6.20



Bundi        Bundi (ii)      Chahi 17/-    18/-    3        6.00



-do- Hindoli 50      Chahi  17/-    18/-    3        6.00



-do-          Ninwa 19      Chahi  17/-    18/-    3        6.00



Total                86



[Notification No. F 9(2) Irg./57-I dated 19-11-1960, published in Rajasthan Gazette, Part IV-C, Ordinary, dated 2-2-1961.]



In pursuance of Sub-section(6) of section 5 of the Rajasthan Lands Special Irrigation Charges Act, 1953 (25 of 19530, read with rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954 the state Government does hereby determine, sanction and publish the following final schedule of betterment charges in respect of the lands in the following irrigated by the Sadul Branch of the Bhakra Canal. Included in the assessment circle 1 to 7 Tehsil Suratgarh, 2 villages of Tehsil Padampur and 2 of Anupgarh Tehsil.



Suratgarh Tehsil.



Circle No. 1. - Ayalki, Bilichawala, Dulmana, Goluwala Bas Nawada, Goluwala Bas Siyagan, Govindgarh, Hansliya, Hardayalpura, Kherlian, Kanwala, Dulmani, Lakhasar, Longwala, Sadanwinghwala, Umewale.



Circle No. 2. - Bhagwangarh, Bhagibandar, Dhaban, Gursarmodia, Ghamandiya, Jorkiya, Khothanwali, Rampura Sidhwan, Sardarpura Bika, Surewali, Sidhpura.



Circle No. 3. - Ampura Rathan, Lakawali, Dingwa, Ahmadapura, Lakhamisar, Thirajwala.



Circle No. 4. - Prempura, Bhagsar Khurd, Sidhuwala, Sheopura, Bhagwansar, Karanisar, Karanisar-Utradha, Lalpura, Rampura, Ramesar Jakharan, Sahuwala, Sengar, Sardargarh.



Circle No. 5. - Baropal, Kalibanga, Nihalpura, Pillibangan, Lud-hana, Manakthedi.



Circle No. 6. - Amarpura Jatan, Suratgarh, Mohammadabad, Bheronpur (Silanwali), Manaksar, Rangmhal.



Circle No. 7. - Barekan, Shri Ramsar, Dhirdeshar, Kanpur, Bir Suratgarh, Chak Nali Bhagwansar, Chak Nali Karanisar, Chak Nali Rampura, Birdulwani.



Padampur Tehsil:



Manjuwas, Narisinghpura.



Anupgarh Tehsil:



Daulatabad, Hindo.



The Final Schedule



S.No.        Name of District       Name of Tehsil         Name of assessment circle  No. of villages      Class of Soil   Charges if paid in lump sum Charges, if paid in instalments



                                                               Charges        Maximum number of instalments      Minimum amount on instalments



1    2        3        4        5        6        7        8        9        10



                                                      Per acre        Per acre                  Per acre



1.   Ganganagar   Suratgarh      1 to 7  66      Nali     266/-  336/-  24      14/-



      -do-    -do-    -do-    66      Rohi    208/-  264/-  24      11/-



2.   Ganganagar   Padampur      1 to 7  2        Nali     266/-  336/-  24      14/-



      -do-    -do-    -do-    2        Rohi    208/-  264/-  24      11/-



3.   -do-    Anupgarh       1 to 7  2        Nali     266/-  336/-  24      14/-



      -do-              -do-    2        Rohi    208/-  264/-  24      11/-



Note:- The above instalments will be recovered annually so long as the canals are non-perennial and half-yearly after they become perennial. The recovery will take effect retrospectively i.e. from Rabi 1958 but actual collection, for the timely being will be made in accordance with Government Order No. F. 14 (c) Irg./57 dated 15/16 January, 1960.



[Notification No. F.9(2) Irg./57-II dated 29-11-1960, published in Rajasthan Gazette, Part IV-C, Ordinary dated 2-2- 1961.]



In pursuance of Sub-section (6) of section 5 of the Rajasthan Lands Special Irrigation Charges Act, 1953 (Rajasthan Act XXV of 1953), read with rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954, the Government of Rajasthan does hereby determine, sanction and publish the following final schedule of betterment charges in respect of the lands in the following villages irrigated by the Amarsingh sub-branch in Rajasthan and Fatehabad Tail (Punjab) of Bhakra Canal, included in the assessment circle Tal & Tal Tibba of Tehsil Bhadra.



Tehsil Bhadra.



Circle Tax. - Udhrau, Babal Bas, Bharani, Bhirun Chhani, Ber, Biran, Janan, Jhansat, Chhani Badi, Ramgar-hia, Sarga, Sardarpura, Bas-Chirya Gandhik, Sawai Chhani, Sahuwala, Gandhi Badi, Sharpura, Gadhi, Chhani, Nal Khera, Mehrana, Nenan, Chak Chiya Gandhi, Chirya Gandhi.



Circle Tal Tibba. - Beharipura, Bhojasar, Chak Bhojasar, Patwa, Bid Bhadra, Jogiwala, Jhurdpura, Dholpalia Dhobi Dungarwas, Rajpura, Bhadra, Ratanpura, Sardarpura Bas Bhadra, Sardarpura Bas Bhola, Sardargarhia, Sikrori. Sheopura, Suratpura, Karnapura, Khachwana, Sri Gan-gasinghpura, Ganeshpura, Lakhanbas, Motipura, Munari, Nangal, Hathipura, Amarpura Nethrana Bharwana.



The Final Schedule



S.No.        Name of District       Name of Tehsil         Name of assessment circle  No. of villages      Class of Soil   Charges if paid in lump sum Charges, if paid in instalments



                                                               Charges        Maximum number of instalments      Minimum amount on instalments



1.   Ganganagar   Bhadra Tal.     22      Rohi    208/-  264/-  24      11/-



      Ganganagar   Bhadra Tal Tibba       31      Rohi    208/-  264/-  24      11/-



Note. - The above instalments will be recovered annually so long as the canals are non-perennial and half-yearly after they become perennial. The recovery will take effect retrospectively i.e. from Rabi 1958-59. But actual collection for the time being will be made in accordance with the Government order No. F. 14 (c) Irg./57 dated 15/16 January 1960.



[Notification No. F.14 (c) Irg./60, dated 6-1-61, published in Rajasthan Gazette, Part IV-C, Ordinary, dated 2-2-1961.]



In exercise of the powers conferred under section 5 of the Rajasthan Lands Special Irrigation Charges Act (No. XXV of 1953) and rule 5 of the Rajasthan Lands Special Irrigation Charges Rules, 1954, the State Government hereby constitutes the following Boards consisting of the Officers mentioned below, to assess the betterment fee leviable on the lands coming under the command of the Irrigation Projects, specified under each Board:-



(2) And further in exercise of the powers conferred under Subsection (7) of section 5 of the Rajasthan Lands Special Irrigation Charges Act, (No. XXV of 1953), the State Government hereby fix the Pre-project and the Post Project dates for each project as mentioned below against their names:-



I. Morel Board



Divisional Commissioner, Ajmer  ...       ... Convener



Collector, Jaipur    ...       ... Member



Collector, Sawai Madhopur         ...       ... Member



Executive Engineers, Irrigation concerned        ... Member.



      Name of Project       Pre-Project Date       Post-Project Date.



1.   Morel Project  31st March, 1947      1st April, 1959.



II. Jaipur Board



Collector, Jaipur    ... Convener



Executive Engineer, Irrigation concerned          ... Member



      Name of Project       Pre-Project Date       Post-Project Date.



1.   Bhagwatgarh  31st March, 1950      1st April, 1954.



2.   Mui     31st March 1948       1st April, 1956.



3.   Pancholas      31st March, 1953      1st April, 1958.



4.   Nag Talai       31st March, 1949      1st April, 1957.



5.   Nindar 31st March, 1949      1st April, 1958.



6.   Manchari       31st March, 1951      1st April, 1956.



7.   Jagrampura   31st March, 1949      1st April, 1955.



III. Tonk Board



Collector, Tonk     ...       ... Convener



Executive Engineer, Irrigation concerned ... Member.



      Name of Project       Pre-Project Date       Post-Project Date.



1.   Galwa  31st March, 1954      1st April, 1959.



2.   Mashi  31st March, 1954      1st April, 1959.



3.   Galwania       31st March, 1952-53 1st April, 1954-55.



4.   Daulatsagar   31st March, 1955      1st April, 1959.



5.   Dakhia 31st March, 1951      1st April, 1959.



IV. Bhilwara Board.



Collector, Bhilwara ... Convener.



Executive Engineer, Irrigation concerned ... Member



      Name of Project       Pre-Project Date       Post-Project Date.



1.   Khari   31st March, 1953      1st April, 1957.



2.   Arwar  31st March, 1954      1st April, 1959.



3.   Patan  31st March, 1954      1st April, 1958.



4.   Nagdi  31st March, 1955      1st April, 1959.



5.   Brahmano-ki-Sarari   31st March, 1952      1st April. 1957.



V. Udaipur Board



Divisional Commissioner, Udaipur ... Convener.



Collector, Bhilwara ... Member



Collector, Udaipur  ... Member



Executive Engineer, Irrigation, Kankroli  ... Member



Executive Engineer, Irrigation, Udaipur   ... Member



      Name of Project       Pre-Project Date       Post-Project Date



1.   Chandra Bhaga         31st March, 1955      1st April, 1958



2.   Namano-cum-Madri   31st March, 1953      1st April, 1959



3.   Jai Sainand Old Tank 31st March, 1953      1st April, 1959



4.   Udaisngar      31st March, 1953-54 1st April, 1958



VI. Dungarpur Board



Collector, Dungarpur       ... Convener



Executive Engineer, Irrigation concerned ... Member



      Name of Project       Pre-Project Date       Post-Project Date



1.   Lodi Sagar     31st March, 1953      1st July, 1959



VII. Jodhpur Board



Divisional Commissioner, Jodhpur          ... Convener



Collector Jalore     ... Member



Collector Sirohi     ... Member



Collector Pali        ... Member



Executive Engineer, Irrigation incharge of the works    ... Member



      Name of Project       Pre-Project Date       Post-Project Date



1.   K.Bankli         31st March, 1953      1st July, 1955



2.   Giri-Nanda     31st march, 1953     1st July, 1958



3.   Harsora         31st March, 1952      1st July, 1954



4.   Tokra  31st March, 1957      1st July, 1959



5.   Hemawas      31st March, 1954      1st July, 1958



6.   Sukri   31st March, 1953      1st July, 1956



This supersedes all previous Notifications issued from time to time regarding constitution of Betterment Boards for the above mentioned irrigation projects.



[Notification No. F.14(5) Irg./61. dated 16-7-1962, Published in the Rajasthan Gazette, Part IV-C, Supplement No. 19 dated 9-8-1962.]



In pursuance of Sub-section (6) of section 5 of the Rajasthan Lands Special Irrigation Charges 1953 (Rajasthan Act XXV of 1953) read with Rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954, the State Government hereby determines sanctions and publishes the following final schedule of Betterment Charges in respect of the lands in the following villages commanded by the Moti sagar Non-perennial Irrigation Project of Distt. Tonk.



Tehsil Tonk. - (1) Amirpur Khera, (2) Thali (3) Mohammad Gunj, (4) Dakhia, (5) Chhan, (6) Bharani, (7) Alipura, (8) Mahuwa.



Tehsil Deoli. - (1) Dhuwan Kalan, (2) Jagtia, (3) Bharna.



Final Schedule of Betterment Charges



Class of land        Betterment Charges per acre         No. of Half yearly instalments        Amount of each instalments



      if paid in lump sum   if paid in instalments          



1    2        3        4        5



Chahi        20      21      6        Rs.3.50 nP.



Talabi        30      32      6        Rs. 5.00 nP in 1st 4 instalments & 6.00 in next 2 instalments



Barani       60      72      20      Rs. 3.60 nP.



Note:- (i) Recovery of Betterment charges shall be made from the year in which demand slips are distributed khataunies sent to the Tehsils.



(ii) Betterment Levy on Chahi Land shall be assessed only on those fields, which receive the actual benefit of Canal Irrigation.



[Notification No. F.14 (1) Irg./62 dated July, 1962, Published in Rajasthan Gazette Part IV-C, Supplement No. 21 dated 23-8-62]



In pursuance of Sub-section (6) of Section 5 of the Rajasthan Lands Special Irrigation Charges Act, 1953 (Rajasthan Act 25 of 1953) read with rules of the Rajasthan Lands Special Irrigation Charges Rules, 1954, the State Government hereby determines and sanctions the following final Schedule of betterment charges in respect of the lands in the following villages included in Khonwa and Saidpura Innundation Irrigation Schemes of District Bharatpur:-



I. Khanwa Project, Tehsil Roopwas:- (1) Chak Khudasa, (2) Said pura, (3) Pasora, (4) Khijuri, (5) Singhawali, (6) Bokoli, (7) Garhi. (8) Burana, (9) Khudasa, (10) Jindpura, (11) Kandholi, (12) Chandoli, (13) Khanwa, (14) Barbara, (15) Ghata, (16) Chandpura, (17) Murrika, (18) Barga, (19) Odelrh Gaddi.



II. Saidpura Project Tehsil Roopwas:- (1) Bhensa, (2) Bahravali. (3) Sonothi, (4) Nagla Radhey, (5) Nagla Bhagat, (6) Madriyapur, (7) Bansi, (8) Mahal.



Final Schedule of Betterment Charges



Class of land        Betterment Charges per acre         No. of Half yearly instalments        Amount of each instalments



      if paid in lump sum   if paid in instalments          



1    2        3        4        5



Barani, Parat and Banjar  Rs. 30/-        25/-    10      Rs. 2.50 nP.



Recovery of Betterment charges shall be made from the year in which demand slips are distributed and khataunies sent to the Tehsils.



[Notification No. F.14 (6) Irg./61 dated 21-6-1962, Published in Rajasthan Gazette part IV (C), dated 12-7-1962, Page 326.] - In pursuance of Sub-section (6) of section 8 of the Rajasthan Lands Special Irrigation Charges Act. 1953 (Rajasthan Act XXV of 1953), read with Rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954 the Government of Rajasthan does hereby determine, sanction and publish the following final schedule of Betterment charges in respect of the lands in the following villages Commanded by the Jhilmili, Bhandari and Kalakho non-perennial Irrigation projects of District Jaipur.



1. Jhilmili Non-Perennial Irrigation Scheme



1. Tehsil Dausa:- 1. Kishanpura-Bara, 2. Girdharpura, 3. Hasdatti, 4. Nayagon, 5. Chack-Delhwas, 6. Koliawas, 7. Sekhpura, 8. Dublia, 9. Bad-Bidarkha, 10. Chack-Ramthala, 11. Khedwas, 12. Butoli, 13. Mendera Sunarpura, 14. Jag-Rampura, 15. Pooranwas, 16. Purbiwas, 17 Dungrawas.



2. Bhandari Non-Perennial Irrigation Scheme



1. Tehsil Sikrai:- 1. Pilwa Kalan, 2. Dolika, 3. Dubbi, 4. Kelai, 5. Bhandari, 6. Dhonkarwara, 7. Nihalpura, 8. Kalera, 9. Bhojpura.



1. Tehsil Dausa:- (1) Kalakho.



2. Tehsil Baswa:- (1) Khuntala, (2) Sahupura.



3. Tehsil Sikrai:- 1. Reta, 2. Dubbi, 3. Kelai, 4. Bhojupura, 5. Girdharpura, 6. Kalera, 7. Sikandara, 8. Basra, 9. Bhahman Berada, 10. Gohakya, 11. Bidarwara, 12. Raipur, 13. Bawanpara, 14. Gannsi, 15. Murisara, 16. Sanwas, 17. Piplika, 18. Likhli.



Final Schedule of Betterment Charges.



Class of land        Betterment Charges per acre         No. of annual instalments    Amount of each instalment



      if paid in lump sum   if paid in instalments          



1    2        3        4        5



Barani and Banjar Rs. 60/-        Rs. 72/-        10      Rs.7.20 nP.



Chahi & Nehri       Rs. 20/-        Rs. 22/-        3        (1) Rs. 7.50 nP in first 2 years



Dehri & Talabi       Rs. 30/-        Rs. 37/-        10      (2) Rs. 7.00 in the last 10 years



                                   Rs. 3.70 np.



Note:- (i) Recovery of Betterment charges shall be made from the year in which demand slips are distributed and Khataunies sent to the Tehsils.



(ii) Betterment Levy on Chahi Lands shall be assessed only on those fields which receive the actual benefit of canal Irrigation.



[Notification No. F 13(22) Irg./65, dated 30-6-1967, Published in Rajasthan Gazette IV-C, dated 7-9-1967, Page 626-628]



In pursuance of sub-section (6) of section 5 of the Rajasthan Lands Special Irrigation Charges Act 1953 (Rajasthan Act XXV of 1953) read with Rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954, the State Government hereby determines. Sanctions and publishes the following final Schedule of Betterment Charges in respect of the Lands in the following villages commanded by (1) Galwa (2) Mashi and (3) Galwania non-perennial Irrigation Projects Distt. Tonk.



1. Galwa Irrigation Project Tehsil Aligarh.



Name of villages:- 1. Govindpura, 2. Roop-pura, 3. Vijaigarh. 4. Hukampura, 5. Banderia, 6. Banetha, 7. Suthra, 8. Devri, 9. Kishan-ganj, 10. Khalinia, 11. Laxmipura, 12. Chitani, 13. Uniari, 14. Parwan, 15. Udaipura, 16. Kholia, 17. Uniara, 18. Brodia, 19. Dhokolia. 20. Hardatpura, 21. Brodhan, 22. Rughnathpura, 23. Chainpura. 24. Ramjan-ganj, 25. Saidri, 26. Kunder, 27. Debla, 28. Biogolia, 29. Mandalla, 30. Balithal, 31. Karood, 32. Ramnagar, 33. Kundia, 34. Bundi, 35. Tehkriya, 36. Poundera, 37. Sureli.



2. Mashi Irrigation Project Tehsil



Name of villages:- 1. Molipura, 2. Abbasnagar, 3. Ishkpura alias Neemahri, 4 Kashipura, 5. Walaitpura, 6. Onkarpura, 7. Mohd. Nagar, 8. Pyavri, 9. Alimpura, 10. Balkhandya, 11. Azampura, 12. Devri, 13. Kaehholiya, 14. Islampura, 15. Pasrotiya, 16. Maulipura. alias Alitnagar, 17. Sandhera, 18. Kishanpura, 19. Galled, 20. Mamana, 21 Nathri, 22. Doonidiya, 23. Markhera, 24. Kureri, 25. Kurera, 26. Loharwara, 27. Piploo, 28. Moondiya, 29. Guda Ram Dass.



3. Galwani Irrigation Project, Tehsil Aligarh, Sawaimadhopur and Indergarh.



Name of villages of Tehsil Aligarh. - 1. Kotri, 2. Raheemnagar, 3. Ibrahimganj. 4. Kishanpura, 5. Almirganj, 6. Manoharpura, 7. Roshanpura, 8. Mohammadpura, 9. Galwania, 10. Sedrigoojran, 11. sedri-Mahagwan, 12. Belanganj, 13. Nagirpur, 14. Kaswari, 15. Nawab-ganj, 16. Rughunathpura, 17. Chak-Karwari.



Name of villages of Tehsil Sawaimadhopur:- 1. Kherla, 2. Khijuri.



Name of villages of Tehsil Indergarh. - 1. Chimanganj, 2. Bubi, 3. Kalaynapura alias Payga.



Final Schedule of Betterment Charges



Name of Project   Class of land  Rates of Betterment Charges per acre      No. of annual instalments Amount of each instalment



               if paid in lump sum   if paid in instalments          



1. Galwa    Barani Rs. 40/-        Rs. 50/-        10      Rs.5.00



2. Galwani                                       



3. Mashi                                          



Notes:-



(1) Notice for realisation of betterment levy shall issue in respect of lands actually receiving irrigation after the commencement of the Scheme. Lands not receiving irrigation even though included in the command may not be charged betterment levy.



(2) Lands which have not received irrigation at all, shall not be charged betterment levy till they have actually received irrigation.



(3) Lands declared "Chahi" in the Settlement records shall not be charged any betterment levy.



(4) Lands that have suffered damage on account of water logging and which could not be improved by suitable measures shall not be assessed to betterment levy.



(5) That the recovery of betterment levy shall be made from the year in which Demand Slips and khataunies are distributed.



[Notification No. F. 13(6) Irg. /67, dated 25-7-1967.]



In pursuance of Sub-section (6) of section 5 of the Rajasthan Lands Special Irrigation Charges Act, 1953 (Rajasthan Act XXV of 1953) read with Rule 9 of the Rajasthan Lands Special Irrigation Charges Rules, 1954 the State Government hereby determines, sanctions and publishes the following final schedule of Betterment Charges in respect of the lands in the following villages commanded by the Lodisar NOn-perennial Irrigation Project District Dungarpur:-



Tehsil Sagwara:-



1. Ambara, 2. Vdaiya, 3. Obari, 4. Khadagada, 5. Khuravvara, 6. Khumenpur, 7. Gadha Jairajpur, 8. Gada Bejra, 9. Galiacola, 10. Ghoted, 11. Chitari, 12. Jogpur, 13. Johra, 14. Diwarkhurd, 15. Parli, 16. Parda Mataji, 17. Parda Joon, 18. Pipala Goj., 19. Badgi, 20. Vaniyay, 21. Siloi, 22. Surajgaon.



Final Schedule of Betterment Charges



Class of land        Betterment Charges per acre         No. of annual instalments    Amount of each instalment



      if paid in lump sum   if paid in instalments          



1    2        3        4        5



Rohan and Seerma         Rs. 19/-        Rs. 23/-        10      Rs. 2.30 nP



Barani and Parat   Rs. 28/-        Rs. 34/-        10      Rs. 3.40 nP



Note:-(1) Notice for realisation of betterment levy shall issue in respect of lands actually receiving irrigation after the commencement of the Scheme. Lands not receiving irrigation even though included in the command may not be charged betterment levy.



(2) Lands which have not received irrigation at all shall not be charged betterment levy till they have actually received irrigation.



(3) Lands declared Chahi in the Settlement of Records shall not be charged any Betterment Levy.



(4) Lands that have suffered damage on account of water logging and which could not be improved by suitable measures, shall not be assessed to Betterment levy.



(5) The recovery of Betterment levy shall be made from the year in which Demand Slips and Khatonies are distributed.


Act Type :- Rajasthan State Acts
 
  CDJLawJournal